Product Description
Adjustable arced formwork
Plywood is utilized for the panel of adjustable arced formwork,as it has a certain toughness and can be deformed without being damaged after applying an appropriate external force.By taking its such features and geometric principles,the adjustment system is used to bend the panel into the designed arcs.The adjacent adjustable arced formwork unit can be seamlessly connected by adjustable frame clamps.
This formwork system is suitable for any arced piers with radius longer than 2 meters.
The plywood of adjustable arced formwork is 18mm thick and tough. It can resist certain pressure and can be adjusted to designed arc. The following is the sketch of one standard unit.
Adjacent units can be connected without gap by adjustable steel clamp.
Products Show
Assembly process
1.Assembly of timber beam and timber connector |
2.Assembly of plywood and edge rib |
3.Assembly of regulating system |
4.Assembly of connecting waling |
5.Overall adjustment: The formwork is bent by the adjusting system until the bending radiu of the formwork reaches the expected design value. |
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Our Company
Customer Photos
FAQ
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us !