Advanced Aluminum Frame Formwork for Moisture-Heavy Building Projects
Contact Supplier
Product Highlights
- Lightweight & Crane-Free: Panels up to 70.9kg allow manual handling, eliminating crane needs for shear walls and foundations.
- High Precision & Safety: Ensures precise concrete dimensions for elevators/stairs and improves safety in narrow basement spaces.
- Fast Installation: Hand-held system allows pour heights up to 3m in one lift, simplifying shear wall construction.
- Versatile Application: Ideal for shear walls, elevator shafts, stairwells, foundations, and basements with flexible interfaces.
- Customizable Design: Full customization available from samples or designs to fit specific structural drawings via Auto-CAD.
- 1-Year Warranty: Comprehensive 1-year warranty coverage with online technical support for peace of mind.
- Quality Assurance: ISO certified with third-party inspection options available at the factory before shipment.
- One-Stop Service: Complete service from consulting, design, manufacture, delivery to after-sales and on-site supervision.
Product Attributes
- Customization
- Available
- After-sales Service
- Online Technical Support
- Warranty
- 1 Year
- Model NO.
- Wall/Column Formwork
- Certification
- ISO
- Material
- Aluminum
- Type
- Wall/Column Formwork
- Model No.
- LG-Af-120
- Aluminum Type
- 6061-T6
- Permitted Concrete Pressure
- 60kN/Sqm
- Thickness of Plywood
- 15mm
- Transport Package
- Container
- Specification
- Standard
- Trademark
- LIANGGONG
- Origin
- China
- HS Code
- 7308400000
- Production Capacity
- 20000 Pieces/Month
- Package Size
- 20.00cm * 20.00cm * 20.00cm
- Package Gross Weight
- 1500.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Advanced Aluminum Frame Formwork for Moisture-Heavy Building Projects
Find Similar Products
Product Description
Aluminum Frame Formwork
Shear walls are designed to counteract lateral loads, such as those from wind or earthquakes, that act on structures. The heaviest aluminium panel measures 300 cm × 100 cm and weighs 70.9 kg, which two workers can carry without the need for a crane. The LG-AF panel is a hand-held system formwork that allows for a pour height of up to 3 m in a single lift. This innovation simplifies the process of forming shear walls. With its range of sizes and ease of use, the LG-AF panel adds flexibility to site operations.
The precise dimensions of concrete achieved with LG-AF panels are important to make the latter installation of the elevator faster and smoother. The low weight of the panels allow for safe operations, avoiding the risky handling of heavy elements by crane within confined space. The LG-AF panel system is ideal for constructing stairwelis and elevator shafts.The lightweight design of the panels allows carpenters to easily install and dismantle the formwork, giving them the option to quickly repeat the same process throughout various floors of the building. The range of panels and accessories included in the system make it easy to
form cornersand wall intersections.
Aluminium Frame Formwork (LG-AF-120) is the perfect formwork for strip footing, tie beams, pile caps and plinths. During the initial phases of a construction site, no crane is available. A hand-held system formwork is ideal to do the job quickly and safely without compromises on the quality and precision of the concrete. LG-AF-120 panel is the best choice for foundation engineering. Whether it's for strip footings, pile caps, or plinths, the panels will be up to the job. A whole series of accessories provides multiple ways to support and prop the panels. Easy interface with timbers also provides maximum flexibility on site.
A lightweight formwork provides evident advantages when pouring concrete for basements. Being able to work without a crane is an advantage in every early stage of a project, LG-AF-120 is indeed a good option for basement engineering.
Basement engineering often has no access to the crane, and must work with a truck crane, or by hand. LG-AF-120 panels can be easily handled in the narrow space allowed by the excavation, so that site safety is greatly improved.
| Packing | 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
| 2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container. |
|
| Delivery | 1. Production: For full container, normally we need 20-30 days after receive customer's down payment. |
| 2. Transportation: It depends on the destination charge port. | |
| 3. Negotiation is needed for special requirements. |


Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship.
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2541548". Items marked "" are certified.
Company Profile
Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.
During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & Civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.
Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 8, Shanghai Road, Economic Development Zone, Jianhu County, Yancheng, Jiangsu, China
-
Plant Area
- 12870 square meters
-
Number of Employees
- 224
-
Registered Capital
- 19,880,000 RMB
-
Terms of Payment
- LC, T/T
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: one month -
Nearest Port
- Shanghai Port
-
Minimum Order Quantity
- 1 Set
-
Supply Chain Partners
- 25
Our Production Capability & Technical Expertise
-
Main Products
- Construction Formwork (Trench Box, Plastic Formwork, H20 Timber Beam Formwork, Steel Frame Formwork, Aluminium Frame Formwork, Climbing Formwork, T-Form for Slab Construction, Tunnel Formwork)
-
Production Lines
- 10
-
Production Machines
- Laser Cutting Machine, Punching Hole Machine, Stamping Machine, Drilling Machine, Sawing Machine, Shot Blasting Machine, Bending Machine, Welding Robot
-
QA/QC inspectors
- 10 people
-
Inspection Type for Finished Products
- Random inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 45 people
-
Traceability of Raw Materials
- Yes
-
Test Reports for Raw Materials
- Others
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2010-08-25
-
Export Year
- 10 Years
-
Main Markets
- North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic, Oceania
-
Repeat Buyers Choice
- 50%~80%
-
Annual Export Revenue
- 7,272,436 USD
-
Number of Foreign Trading Staff
- 20
-
Overseas Agent/Branch
- Yes
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO9001:2015
-
Cooperated with Fortune 500
- No
FAQ
- Are you a factory or trading company?
- We are a factory.
- How to get a quotation?
- You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
- What is the payment term?
- By T/T or L/C.
- What is the lead time?
- Generally, it takes 25-30 days according to the quantity.
- What is the package method?
- We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
- Do you have any guarantee on the quality?
- We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
- Do you have on-site supervision service?
- Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
- What benefit can we get from LIANGGONG?
- From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Send your message to this supplier
People who viewed this also viewed
-
US$52.99-55.99 / Square Meter
-
US$25.00-30.00 / Piece
-
US$100.00-200.00 / Square Meter
-
US$55.00-65.00 / Square Meter
-
US$40.00-45.00 / Square Meter
-
US$70.00-75.00 / Square Meter
-
US$40.00-50.00 / Square Meter
-
US$900.00-1,000.00 / Ton
Find Similar Products By Category
- Supplier Homepage
- Products
- Aluminum Formwork Systems
- Aluminum Frame Formwork
- Advanced Aluminum Frame Formwork for Moisture-Heavy Building Projects
Related Categories
Hot Searches
- Construction Materials Factories
- Construction Building
- China Formwork Factories
- Steel Construction Factories
- Formwork In Construction
- Construction Building Formwork
- Construction Formwork Materials
- Steel Formwork For Construction
- Construction Steel Formwork
- Moisture-Proof Formwork Bulkbuy