Yancheng Lianggong Formwork Co., Ltd, founded in 2010, is
a pioneer manufacturer mainly engaged in the production
and sales of formwork system & scaffolding. Thanks to 11
years of abundant factory experience, Lianggong has won
high praise from customers both home and abroad for
satisfactory product quality and perfect after-sales service.
Till now, we have cooperated with lots of top formwork
companies and construction companies, such as
DOKA,PERI and etc. Our advanced production equipment
and proficient front-line employees will guarantee you
products with better quality and less time.
Besides, Lianggong has a professional technical department
working together with sales department to ensure our
customers' requirements are fully achieved. We offer one-
stop service, you can choose products either off-the-shelf or
customized.
What's more, our company has established a quality
management system that meets the requirements of the
international quality management system. Our products have
strict quality control from the procurement of raw materials to
the sale of finished products which have been used in many
projects such as industrial civil engineering works, roads and
bridges, hydroelectric dam and nuclear power station. We
can accept O E M and O D M.
We sincerely welcome friends from all over the world to visit
our company and cooperate with us on the basis of long-term
mutual benefits.
For more information, feel free to contact us. We are looking
forward to receiving your enquiry soon.
Workshop Photos
Certifications

Exhibitions and Customer Visits
Aluminium Support
It is light and sturdy and can ensure convenient
transportation, quick erection, high efficiency, low
labor and storage costs, and provide a larger and
wider operating space for the workplace,
providing a highly cost-effective solution for
construction applications.
Model |
Minimum Length(mm) |
Maximum Length(mm) |
A(mm) |
B(mm) |
Weight(kg) |
Min-Max Load(KN) |
AMP250
|
1450 |
2500 |
1365 |
1071 |
15.75 |
60-70 |
AMP350 |
1980 |
3500 |
1865 |
1571 |
19.45 |
42-88
|
AMP480
|
2600 |
4800 |
2515 |
2221 |
24.6 |
25-85 |
1
|
Lightweight and sturdy
|
6
|
Single column boasts extremely high load-bearing capacity
|
2
|
Simple operation
|
7 |
Multi-directional connection design
|
3
|
Safer application
|
8 |
Lower transportation and storage costs
|
4
|
Long service life with low wear and tear
|
9 |
Versatile functions, suitable for various applications
|
5
|
Fewer columns required, wider column spacing
|
10 |
Efficient assembly with minimal labor demand
|
Packing |
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
|
2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container.
|
Delivery |
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
|
2. Transportation: It depends on the destination charge port.
|
3. Negotiation is needed for special requirements.
|
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship.
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.
Click Here To Contact Me!
Tunnel Formwork For Housing H20 Timber Beam Formwork System Aluminium Frame Formwork