China High-Quality Concrete Steel Tunnel Formwork for Building Construction Cellular Structure House
Product Description
Tunnel Formwork for Housing
Advanced Tunnel formwork identified to be suitable for conditions for mass construction, where quality and speed can be achieved at high level. The speed of construction by this system will surpass speed of most of the other construction systems. The labour in coordination with heavy machineries (eg. tower crane) handles this method effectively to speed up the construction, to assure quality control and durability. Adoption of this system reduces overall cost of the structure.
Advantage
I. Time Advantages
1. A production cycle of 1-3 days can be achieved.
2. Depending on the production speed of load bearing system succeeding production activities in the building can also be accelerated.
3. The project can be completed in a short time compared to traditional construction systems.
4. Due to accelerated production, effects of climatic conditions on productivity are minimized. |
II. Quality Advantages
1. Higher precision in production of walls and slab units.
2. Smooth surfaces for the walls and slabs are obtained that can be covered with wallpaper right after easy and quick cleaning.
3. Standard dimensions for the other components such as carpet, windows, and doors can be applicable due to strict dimensions of load-bearing system elements. |
III. Cost Advantages
1. Formwork cost per m2 (or per housing unit) can be reduced by using formwork up to number of times.
2. Due to smooth surfaces, walls and slabs do not need any additional finishing such as plaster.
3. Early completion of project provides financial opportunities such as rental incomes.
4. Repetitive nature of buildings provides effectiveness in production and minimization of labor costs. |
Assembly details
Pull out the upper pin , the guardrail can
be opened for the formwork so as to be out
of the mold.
Use a thin iron chain to connect the
guardrail with the platform on the upper
part of the guardrail to reset the
guardrail.
Packaging & Shipping
Packing Details: Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details: Generally it is 25-30 days, it is according to quantity.
Port: Shanghai
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
Any question, please feel free to contact us !