2.The system can climb integrally or separately. The climbing process is steady, synchronous, and safe.
3.The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced.
4.The system will furnish all-round platforms and additional platform is not needed.
5.The auto-climbing formwork can climb by itself an d cleaning work can be done in situ. The use of tower crane will be greatly reduced.
Packaging & Shipping
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our service
1.Consulting,Design,and Quotation