Lianggong Formwork Slab Beam Formwork for Concrete Casting

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Formwork Slab Beam Formwork for Concrete Casting
  • Lianggong Formwork Slab Beam Formwork for Concrete Casting
  • Lianggong Formwork Slab Beam Formwork for Concrete Casting
  • Lianggong Formwork Slab Beam Formwork for Concrete Casting
  • Lianggong Formwork Slab Beam Formwork for Concrete Casting
  • Lianggong Formwork Slab Beam Formwork for Concrete Casting
Find Similar Products

Basic Info.

Model NO.
formwork
Certification
ISO, CE, ISO9001
Material
Q235steel
Type
Beam Formwork
Materials
Steel,Plywood
Application
Hotel, Wall, Column, Core Tube, etc
Place of Origin
Jiangsu, China
Surface Treatment
Customised
Transport Package
Standard Package
Specification
Standard & Customized
Trademark
Lianggong
Origin
Yancheng, China

Product Description

Product Description
Beam-clamp is one instrument for support girder formwork, it is easy to install and disassemble. The suite of Formwork System makes conventional forming process of Beam Formwork simple, and increases the construction efficiency.
Lianggong Formwork Slab Beam Formwork for Concrete Casting

Lianggong Formwork Slab Beam Formwork for Concrete Casting

Lianggong Formwork Slab Beam Formwork for Concrete Casting

Lianggong Formwork Slab Beam Formwork for Concrete Casting

Table formwork

Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting fork to an upper level and reused, without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks, eel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly.
Lianggong Formwork Slab Beam Formwork for Concrete CastingStandard unit of table formwork:

Table formwork standard unit has two sizes: 2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:

Assembly diagram of standard table formwork:

1 Arrange the table heads as designed.
2 Fix the main beams.
3 Fix the secondary main beam by angle connector.
4 Fix the plywood by tapping screws.
5 Set the floor prop.


Edge and middle filler:

Lianggong Formwork Slab Beam Formwork for Concrete Casting
Lifting Fork
Lianggong Formwork Slab Beam Formwork for Concrete Casting

Lianggong Formwork Slab Beam Formwork for Concrete Casting
Products Show
Lianggong Formwork Slab Beam Formwork for Concrete Casting
Lianggong Formwork Slab Beam Formwork for Concrete Casting
Lianggong Formwork Slab Beam Formwork for Concrete Casting
Lianggong Formwork Slab Beam Formwork for Concrete Casting


Assembly process
 
1.Assembly of timber beam and timber connector
2.Assembly of plywood and edge rib
3.Assembly of regulating system
4.Assembly of connecting waling
5.Overall adjustment: The formwork is bent by the adjusting system until the bending radiu of the formwork reaches the expected design value.

Packing & Delivery

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Our Service
1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
 
Our Company
Lianggong Formwork Slab Beam Formwork for Concrete Casting
 
 
Lianggong Formwork Slab Beam Formwork for Concrete Casting
 

Customer Photos
 
 
Lianggong Formwork Slab Beam Formwork for Concrete Casting
 
 
 
Lianggong Formwork Slab Beam Formwork for Concrete Casting
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier