• Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
  • Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
  • Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
  • Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
  • Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
  • Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory

Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory

After-sales Service: Online Technical Support
Warranty: 1 Year
Certification: ISO
Material: Carbon Steel
Type: Wedge Pin
After-Sale Service: Other, Online Technical Support
Samples:
US$ 1.8/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Move Method
Horizontal Mobile Scaffolding
Width&Length
Customization
Brand Name
Lianggong
Usage
Concrete Construction Support
MOQ
10000 PCS
Package
Ton Bag
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
Production Capacity
300 Ton/Tons Per Month

Product Description

 
 
Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
Wedge pin

The wedge pin, high quality construction formwork fastener

and has been used to many large projects like high rise

building, bridge,hydroelectricity, nuclear power projects.
Products Show
 
Name Wedge Pin
MOQ 10000 Pieces
Packing By pallet or according to client request
Delivery 30 days after deposit
Payment TT or L/C at sight

Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System AccessoryConstruction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System AccessoryConstruction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
Packing
1. Generally, the total net weight of loaded container is 22 tons to 25 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

our service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our company

Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
About Us
Yancheng Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.
During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam platform, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.
Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.    

 
 
Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
 

Customer Photos

Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
 
 
 
Construction Concrete Shuttering Steel Wedge Pin/Wedge Lock Clamp for H20 Timber Beam Formwork System Accessory
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

If you have another question, please feel free to contact us !
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25