Equipments Construction Lianggong Tunnel Formwork for House Building

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year
Still deciding? Get samples of US$ 10000/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Equipments Construction Lianggong Tunnel Formwork for House Building
  • Equipments Construction Lianggong Tunnel Formwork for House Building
  • Equipments Construction Lianggong Tunnel Formwork for House Building
  • Equipments Construction Lianggong Tunnel Formwork for House Building
  • Equipments Construction Lianggong Tunnel Formwork for House Building
  • Equipments Construction Lianggong Tunnel Formwork for House Building
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packaging & Shipping
  • Our Service
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Tunnel Formwork
Certification
ISO
Material
Steel
Type
Tunnel Formwork
Color
Red, Blue, or Customized
Surface Treatment
Spray Paint
Application
Housing, Jail Houses, and Student Hostels
Size
Customized
Transport Package
Standard Packing
Specification
Customized
Trademark
Lianggong
Origin
China
HS Code
8480600000
Production Capacity
5000tons/Month

Packaging & Delivery

Package Size
600.00cm * 200.00cm * 400.00cm
Package Gross Weight
100.000kg

Product Description

Product Description

 

Tunnel  Formwork 

Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program.This system produces effective load-bearing structures that are widely used. It is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure.

Depending on the size of the structure, tunnel formwork system provides casting of a floor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production flaws and have reduced fine-structure labor costs. 

 
Detailed Photos

Equipments Construction Lianggong Tunnel Formwork for House BuildingEquipments Construction Lianggong Tunnel Formwork for House Building

Equipments Construction Lianggong Tunnel Formwork for House BuildingEquipments Construction Lianggong Tunnel Formwork for House BuildingEquipments Construction Lianggong Tunnel Formwork for House Building
Characteristics
* The roof wall is formed at one time.
* Modular design, quick to use.
* Factory pre-assembled, easy disassembly and assembly.
* All-steel structure. Strong and durable.
 
Packaging & Shipping

Packaging:

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Company Profile

Equipments Construction Lianggong Tunnel Formwork for House BuildingEquipments Construction Lianggong Tunnel Formwork for House Building

FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier