China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Still deciding? Get samples of US$ 1200/Set
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
  • China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
  • China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
  • China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
  • China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
  • China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
Find Similar Products

Basic Info.

Model NO.
Cantilever Climbing Formwork
Certification
ISO
Material
Steel Wood
Type
Climbing Formwork
Application
Hotel, High Rise Buildings
MOQ
2 Sets
Color
Red,Blue, or Customized
Size
Customised
Place of Origin
Jiangsu, China
Packing
Standard Packing
Brand Name
Lianggong
Height of Bracket
10-15 Meters
Certificate
ISO 9001:2008
Height of Climbing
3-4meters
Advantage
Easy Operation Quick Climbing and High Saftly Coef
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
400 Set/Sets Per Month

Product Description

Cantilever Climbing Formwork

The cantilever climbing formwork CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.
The cantilever climbing formwork CB-240 has lifting units in two types: diagonal brace type and truss type. Truss type is more suitable for the cases with heavier construction load, higher formwork erection and smaller scope of inclination.
The main difference between CB-180 and CB-240 is the main brackets. The width of main platform of these two systems is 180 cm and 240 cm respectively.  
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka

Characteristics

1. Bracket, formwork and construction load are all borne by embedded anchors and wall-through tie rods. No additional scaffolding is needed. It is suitable for construction in the high air.
2. The maximum height of concreting can reach 6 meters, and the whole part of formwork can be moved back 600 mm.
3. The formwork part can be adjusted up and down, and from left to right, relatively to the supporting bracket, and the diagonal brace type formwork can be tilted back and forth.
4. Each connecting parts has a high degree of standardization and versatility.
5.The formwork can be adjusted to stick tightly to concrete surface so as to avoid leaking or misaligning.
6.The bracket system is provided with a suspended platform to facilitate removal of the anchoring parts and the appearance treatment of the concrete.

Two types of cantilever climbing formwork:CB-180&CB-240

China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to DokaChina Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka

Assembly process
 
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
Application  
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
Packing
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

our service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

our company

China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to DokaChina Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
Customer Photos
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
 
 
 
China Lianggong Customized Building Material Steel Cantilever Climbing Formwork for Concrete Construction Similar to Doka
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier