Precast Segment Box Girder Mould for Building Construction

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Precast Segment Box Girder Mould for Building Construction
  • Precast Segment Box Girder Mould for Building Construction
  • Precast Segment Box Girder Mould for Building Construction
  • Precast Segment Box Girder Mould for Building Construction
  • Precast Segment Box Girder Mould for Building Construction
  • Precast Segment Box Girder Mould for Building Construction
Find Similar Products

Basic Info.

Model NO.
Bridge Formwork
Certification
ISO
Material
Steel
Type
Bridge Formwork
Color
Blue,Red , Customized
Technical Suppor
Remote or on-Site Instruction
Application
Bridge Construction
Surface Treatment
High Protected Painted,Power Coated, as Required
Frame Finishing
Painting
Transport Package
Standard Package
Specification
Steel Q235
Trademark
LIANGGONG
Origin
China
HS Code
8480600000
Production Capacity
10000 Pieces/Per Month

Product Description

Product Description
Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
Product Details

Precast Segment Box Girder Mould for Building Construction
Precast Segment Box Girder Mould for Building Construction
Precast Segment Box Girder Mould for Building Construction


Characteristics
1.Construction Simplicity
• easier installation of external post-tensioned tendons
2.Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid installation of viaduct can be achieved.
3.Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/ good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4.Inspection and Maintenance
• external prestressing tendons can be easily inspected and repaired if required.
• maintenance program can be scheduled.

Packing & Delivery
Packaging:
1.Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service
Precast Segment Box Girder Mould for Building Construction
Precast Segment Box Girder Mould for Building Construction
Our Company
Precast Segment Box Girder Mould for Building Construction
Customer Photos
Precast Segment Box Girder Mould for Building Construction
Precast Segment Box Girder Mould for Building Construction
FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier