• Wooden Beam Timber Beam Wall Formwork System for Construction
  • Wooden Beam Timber Beam Wall Formwork System for Construction
  • Wooden Beam Timber Beam Wall Formwork System for Construction
  • Wooden Beam Timber Beam Wall Formwork System for Construction
  • Wooden Beam Timber Beam Wall Formwork System for Construction
  • Wooden Beam Timber Beam Wall Formwork System for Construction

Wooden Beam Timber Beam Wall Formwork System for Construction

After-sales Service: Remote Service
Warranty: One Year
Certification: ISO9000
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Wooden Beam Timber Beam Wall Formwork System for Construction pictures & photos
Wooden Beam Timber Beam Wall Formwork System for Construction
US $98-108 / Square Meter
Min. Order: 500 Square Meters
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Packing & Delivery
  • Our Service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Timber Beam Formwork
Material
Timber Beam, Plywood,Steel Waler
Type
Beam Formwork
Surface Treatment
Yellow Waterproof Painting
Unit Weight
65kg/Sqm
Size
Customized
Usage
Hotel, Wall and Column Concrete Construction
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
4418600090
Production Capacity
10000 Meters/Per Month

Packaging & Delivery

Package Size
29.00cm * 12.00cm * 8.00cm
Package Gross Weight
130.000kg

Product Description

Product Description

 

Timber Beam Formwork
Flat Formwork
The Flat formwork system consists of plywood, H20 timber beam, steel waler and lifting hook. The plywood and the timber beam are connected by the self-tapping screw. Steel waler and timber beam are connected with flange clamp. Two hooks are arranged symmetrically on both sides of the timber beam. The timber beam is assembled on site by standardized accessories, which is convenient for disassembly and assembly.
It is light in weight and convenient for construction and transportation. The formwork panel is plywood, and the board surface is smooth, being good for water absorption and air transmission. Without being tainted, the concrete surface has good appearance, in high quality and turnover rates. Thus, it has been widely used in walls, columns, piers and dams.
Wooden Beam Timber Beam Wall Formwork System for Construction
The Assembly Process

Positioning of walers
Lay walers on the platform at the distance shown in the drawing. Mark the positioning line on the walers and draw the diagonal lines. Let the diagonal lines of the rectangle that is composed by any two walers equal to each other.
Wooden Beam Timber Beam Wall Formwork System for Construction

Timber beam assembling
Lay a timber beam at both ends of the waler according to the dimension shown in the drawing. Mark the positioning line and draw the diagonal lines. Make sure the diagonal lines of the rectangle that is composed by two timber beams equal to each other. Then fix them by flange clamps. Connect the same end of the two timber beams by a thin line as the benchmark line. Lay other timber beams according to the benchmark line and ensure that they are parallel to timber beams on both sides. Fix each timber beam with clamps.
Wooden Beam Timber Beam Wall Formwork System for Construction
Installing lifting hook on timber beam
Install lifting hooks according to the dimension on the drawing. Clamps must be used on both sides of the timber beam where the hook is located, and ensure that the clamps are fastened.
Wooden Beam Timber Beam Wall Formwork System for Construction
Laying panel
Cut the panel according to the drawing and connect the panel with the timber beam by self-tapping screws.
Wooden Beam Timber Beam Wall Formwork System for Construction

Stacking and storage of formwork
When panels and timber beams are stacked, used or transported, collision with hard objects must be avoided, so as to prevent from any damage to the formwork. In addition, they should not be exposed to rain or sunshine. The assembled formwork is stacked as shown in the figure.
Wooden Beam Timber Beam Wall Formwork System for Construction

Assembled Formwork on Site
Wooden Beam Timber Beam Wall Formwork System for Construction

Formwork lifting 
The assembled formwork can be lifted in a complete set as shown in the figure:
Wooden Beam Timber Beam Wall Formwork System for Construction

Packing & Delivery

 

Packing:
1.Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---bundles: Timber beam, steel props, tie rod, etc. 
---pallet: Small parts will be put in bags and then on pallets. 
---wooden cases: It is available on customer's request. 
---bulk: Some irregular goods will be loaded in bulk in container.
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
The Flat formwork system consists of plywood, H20 timber beam, steel waler and lifting hook. The plywood and the timber beam are connected by the self-tapping screw. Steel waler and timber beam are connected with flange clamp. Two hooks are arranged symmetrically on both sides of the timber beam. The timber beam is assembled on site by standardized accessories, which is convenient for disassembly and assembly.
It is light in weight and convenient for construction and transportation. The formwork panel is plywood, and the board surface is smooth, being good for water absorption and air transmission. Without being tainted, the concrete surface has good appearance, in high quality and turnover rates. Thus, it has been widely used in walls, columns, piers and dams.
 
 

Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 

Company Profile

Lianggong Formwork Co. ,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 


During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.  
Wooden Beam Timber Beam Wall Formwork System for Construction
Wooden Beam Timber Beam Wall Formwork System for Construction
Wooden Beam Timber Beam Wall Formwork System for Construction

Customer Photos

 

Wooden Beam Timber Beam Wall Formwork System for Construction

FAQ

Q1:Are you trading company or manufacturer?

A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Wooden Beam Timber Beam Wall Formwork System for Construction pictures & photos
Wooden Beam Timber Beam Wall Formwork System for Construction
US $98-108 / Square Meter
Min. Order: 500 Square Meters
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25