• Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood

Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood

After-sales Service: Remote Service
Warranty: 1 Year
Certification: ISO, CE
Samples:
US$ 30/meter 1 meter(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood pictures & photos
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
US $20-32 / Piece
Min. Order: 100 Pieces
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
formwork
Material
Plastic
Type
Slab Formwork
Usage
Hotel, Wall and Column Concrete Construction
Surface
Plastic
Model Number
PVC Plastic Plywood
Unit Weight
Around 12kg/Sqm
Transport Package
Pallet Packing
Specification
1220*2440*18mm
Trademark
LIANGGONG
Origin
China
Production Capacity
20000

Product Description

 
Product Description
PP Hollow Plastic Borard

PP hollow building formwork adopts imported high performance engineering resin as the base material, adding chemical additives such as toughening, strengthening, weather proof, anti-aging, and fire proof, etc.

  Specification

1. Standard specification (mm): 1830*915/2440*1220
2. Standard thickness (mm): 12, 15, 18.20
3. Product color: black core/white surface, pure gray, pure white.
4. Non-standard specification can be discussed.


 Advantage

1. Reduce costs: reusable more than 50 times.
2. Energy conservation and emission reduction: recyclable.
3. Easy release: no need release agent.
4. Convenient storage: water,sun,corrosion and aging resistance.

5. Easy to maintain: non affinity with concrete, easy to clean up.
6. Lightweight and easy to install:8-10kgs weight per square meter.
7. Fire proof: fire proof hollow formwork can be selected, the fire proof effect reaches V0 level.


Technical Date
 
Test items Test method Result
Bending test Refer to JG/T 418-2013,section 7.2.5 & GB/T9341-2008 Bending strength 25.8MPa
Flexural modulus 1800MPa
Softening temperature of VEKA Refer to JG/T 418-2013, section 7.2.6 & GB/T 1633-2000 method BO5 75.7 °C
 
Name
Construction Shuttering Board concrete Formwork pvc plastic plywood
Size
20,18,15*1220*2440 mm or upon request
Thickness
20,18 mm ,15 mm  or upon request
Face/Back
pvc plastic
Core Board
pvc plastic
Standard Packing
Inner Packing-Pallet is wrapped with 0.20mm plastic bag
Outer Packing-pallets are covered with plywood or carton boxes and strong steel belts


Features
1.Transference to concrete is set up very easily
2.Waterproof, Wear-resistant, anti-cracking
3.Environmentally friendly

 

Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood


Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood

PLYWOOD USAGE AREAS:

Construction Sector; in formworks, in floor and parquet sector, in scaffolding platforms, in roof planking and indoor wall
siding.Furniture Sector; in the production of shelves, tables, chairs, doors and office furniture.Transportation & Naval
Construction Sectors; in the floor construction of the containers, in the railway cars' floor and side walls,in animal
transportation vehicles, in cargo sections of the ships and busses.Packing Sector; as being moisture proof and resistant to chemical materials, stronger, lighter, cheaper and healthy when compared to other products. Especially the Russian Birch is a perfect choice for any kind of packing.


Products Show
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood

Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
Packing & Delivery

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead PlywoodOur Company
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead PlywoodCustomer Photos
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead PlywoodFAQ

Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
 A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing. 
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project. 
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
        If you have another question, please feel free to contact us !



    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood pictures & photos
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Instead Plywood
US $20-32 / Piece
Min. Order: 100 Pieces
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25