Customization: | Available |
---|---|
After-sales Service: | Remote Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 30/meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PP hollow building formwork adopts imported high performance engineering resin as the base material, adding chemical additives such as toughening, strengthening, weather proof, anti-aging, and fire proof, etc.
Test items | Test method | Result | |
Bending test | Refer to JG/T 418-2013,section 7.2.5 & GB/T9341-2008 | Bending strength | 25.8MPa |
Flexural modulus | 1800MPa | ||
Softening temperature of VEKA | Refer to JG/T 418-2013, section 7.2.6 & GB/T 1633-2000 method BO5 | 75.7 °C |
Name
|
Construction Shuttering Board concrete Formwork pvc plastic plywood
|
Size
|
20,18,15*1220*2440 mm or upon request
|
Thickness
|
20,18 mm ,15 mm or upon request
|
Face/Back
|
pvc plastic |
Core Board
|
pvc plastic |
Standard Packing
|
Inner Packing-Pallet is wrapped with 0.20mm plastic bag
Outer Packing-pallets are covered with plywood or carton boxes and strong steel belts |
Features |
1.Transference to concrete is set up very easily
2.Waterproof, Wear-resistant, anti-cracking 3.Environmentally friendly |