Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
H20 Timber Beam Formwork
![]()
Lianggong specializes in delivering high-quality Timber Wall Formwork solutions.
Our Timber Wall Formwork is designed to meet your specific project requirements with exceptional durability and efficiency. We provide tailored options for both our OEM and ODM clients, ensuring that you receive the support you need throughout the process. High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc. These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens. Product Parameters![]()
Timber Beam End Protection
In order to protect the timber beam from being damaged and extend the service life, we've designed the following four end caps for your choice.
![]()
![]() ![]() ![]() Application for Wall ![]() ![]() Application for Column ![]() ![]() ![]() The adjustable column formwork enables concrete casting of square or rectangular columns within a specific range by adjusting the size of the formwork section area. The adjustment is realized by changing the relative position of the walers. There are three specifications for the walers of adjustable column formwork, which can do concrete casting of square or rectangular columns with side length of 200-1400mm. Sizes of column to be casted as follows:
It can be adjusted to any cross-section size within the allowable range, both square and rectangular. The schematic diagram of adjustment is as follows:
![]() Application for Adjustable Arced Formwork ![]() ![]() Introduction 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container.Delivery 1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 2. Transportation: It depends on the destination charge port. 3. Negotiation is needed for special requirements. 1.Consulting,Design,and Quotation Q1: Are you trading company or manufacturer?
Q2. What do you do?
A: We design and manufacture formworkand scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings,towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight. Q4. What can you do for us? A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. B.We sell our products to the contractors, building companies, material supplier or trading companies. C.We support our worldwide peer companies with our outstanding formwork or scaffolding products. D.We provide remote or on-site instruction to thebuilders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer thestructural drawing? A: In general, it takes 5~7 days based on specific requirements of construction project. |
|||||||||||||||||||||||||||||