• Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
  • Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood

Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood

After-sales Service: Remote Service
Warranty: 1year
Certification: ISO, CE
Samples:
US$ 4000/Set 1 Set(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood pictures & photos
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
US $20 / Piece
Min. Order: 1,000 Pieces
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Hollow Formwork Plastic Board
Material
Plastic
Type
Plastic Plywood
Design Style
Contemporary
Color
Yellow and Blue or Customized
Usage
Hotel, Wall and Column Concrete Construction
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Specification
Customized
Trademark
LIANGGONG
Origin
Yancheng, China
Production Capacity
2000

Product Description

 

Product Description

PP Hollow Plastic Borard

PP hollow building formwork adopts imported high performance engineering resin as the base material, adding chemical additives such as toughening, strengthening, weather proof, anti-aging, and fire proof, etc.

  Specification

1. Standard specification (mm): 1830*915/2440*1220
2. Standard thickness (mm): 12, 15, 18.
3. Product color: black core/white surface, pure gray, pure white.
4. Non-standard specification can be discussed.


 Advantage

1. Reduce costs: reusable more than 50 times.
2. Energy conservation and emission reduction: recyclable.
3. Easy release: no need release agent.
4. Convenient storage: water,sun,corrosion and aging resistance.

5. Easy to maintain: non affinity with concrete, easy to clean up.
6. Lightweight and easy to install:8-10kgs weight per square meter.
7. Fire proof: fire proof hollow formwork can be selected, the fire proof effect reaches V0 level.


Technical Date
 
Test items Test method Result
Bending test Refer to JG/T 418-2013,section 7.2.5 & GB/T9341-2008 Bending strength 25.8MPa
Flexural modulus 1800MPa
Softening temperature of VEKA Refer to JG/T 418-2013, section 7.2.6 & GB/T 1633-2000 method BO5 75.7 °C

Usage Method

1. This product does not need release agent.
2. In the season or area with large temperature difference between early and midnight, the product will show slight thermal expansion and cold shrinkage. When laying the formwork, we should control the seam between the two boards within 1mm, the height difference between adjacent formworks should less than 1mm, and the joints should be reinforced with wood or steel, to prevent the emergence of uneven; if there is a larger seam, sponge or adhesive tape can be attached to the seams.
3. The spacing of the roof timber brace is adjusted by the thickness of the concrete, under normal construction conditions, for 150mm thickness floor, the center distance of the adjacent wood brace should be 200 to 250mm;
The shear wall with a thickness of 300mm and a height of 2800mm,  the center distance of the adjacent wood brace should be less than 150mm, and the bottom of the wall should have wood brace;
Depending on the thickness and height of the wall to increase or decrease wood brace spacing;
Column width exceed 1 meter must be fixed.
4. The inside corners should have wood brace, for easy connection between the beam and wall.
5. This product can be mixed with plywood of the same thickness.
6. Please use the alloy saw blades with more than 80 mesh to cut the formwork.
7. The use of this product should be disassembled according to the specific location, and avoid unnecessary waste of cutting.
8. strengthen the worker's safety training before use, improve the awareness of fire prevention, and strictly prohibit smoking at the construction area. It is strictly prohibited to use open fire. Fire blankets should be placed near and below the solder joints before welders operation.
Products Show
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood



Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodOur Company
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodCustomer Photos
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodWaterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace PlywoodFAQ

Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
 A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing. 
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project. 
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
        If you have another question, please feel free to contact us !




    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood pictures & photos
Waterproof Customized PP Hollow Formwork Plastic Board for Concrete Construction Site Replace Plywood
US $20 / Piece
Min. Order: 1,000 Pieces
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25