Scaffolding Coupler for Formwork for Construction Popular in Europe

Product Details
Customization: Available
Material: Steel
Type: Clamp
Still deciding? Get samples of US$ 30/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Scaffolding Coupler for Formwork for Construction Popular in Europe
  • Scaffolding Coupler for Formwork for Construction Popular in Europe
  • Scaffolding Coupler for Formwork for Construction Popular in Europe
  • Scaffolding Coupler for Formwork for Construction Popular in Europe
  • Scaffolding Coupler for Formwork for Construction Popular in Europe
  • Scaffolding Coupler for Formwork for Construction Popular in Europe
Find Similar Products

Basic Info.

Model NO.
formwork
Design Style
Contemporary
Usage
Formwork System Meterails
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
MOQ
1000 PCS
Application
Machine Parts, Formwork
Certification
CE, ISO
Surface Treatment
Yes
After-sales Service
Online Technical Support, Onsite Installation
Warranty
1 Year
Technics
Galvanized
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Specification
Customized
Trademark
LIANGGONG
Origin
Yancheng, China
Production Capacity
2000 PCS/Day

Product Description

Product Description

Our company produces a variety of formwork accessories, high quality, low price, can meet the needs of different formwork.
                                                                             
 
 
 
Scaffolding Coupler for Formwork for Construction Popular in Europe
Scaffolding Coupler for Formwork for Construction Popular in Europe
 
Name Scaffolding coupler
Weight 1.3 kg/pcs
Surface Electric galvanized
MOQ 200 pcs
Payment TT/LC at sight
Scaffolding Coupler for Formwork for Construction Popular in Europe
Scaffolding Coupler for Formwork for Construction Popular in Europe

Scaffolding Coupler for Formwork for Construction Popular in Europe
Scaffolding Coupler for Formwork for Construction Popular in Europe



Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Scaffolding Coupler for Formwork for Construction Popular in Europe



Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Scaffolding Coupler for Formwork for Construction Popular in EuropeOur Company
Scaffolding Coupler for Formwork for Construction Popular in EuropeScaffolding Coupler for Formwork for Construction Popular in EuropeCustomer Photos
Scaffolding Coupler for Formwork for Construction Popular in EuropeScaffolding Coupler for Formwork for Construction Popular in EuropeFAQ

Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
 A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing. 
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project. 
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
        If you have another question, please feel free to contact us !




    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier