China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1 Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
  • China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
  • China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
  • China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
  • China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
  • China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packaging & Shipping
  • Our service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Steel formwork
Material
Steel
Type
Beam Formwork
Surface Treatment
Paint Spraying
Formwork Design
Lianggong Supply
Certificate
ISO9001
Techinique
CO2 Arc Welded
Color
Blue , Red , Customized
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
848060
Production Capacity
5000 Tons /Month

Packaging & Delivery

Package Size
300.00cm * 200.00cm * 100.00cm
Package Gross Weight
500.000kg

Product Description

Product Description

 

Steel bridge Pier Formwork

Bridge Pier Formwork is very important in the construction of highway bridge, overpass bridge, railway bridge, pedestrian bridge, ramp bridge etc. It is used for concrete Colunm Pier Casting in situ, common shapes are: top round pier, cone pier, Y shape pier, hyperbola pier, vase shape pier, linear shape pier, V shape pier, rectangle pier and other speacial shape etc.

According to the shape of Pier Formwork, these formworks are always devided into two types: 
1.General type (Cross Section Shape: Circle, Square, rectangle, Oval) 
2.Special type (Cross Section Shape: Curved, Parabolic, other special design)

 
Detailed Photos

 

China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in SingaporeChina Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in SingaporeChina Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in SingaporeChina Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in SingaporeChina Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
Characteristics

 

General Type: Nice Universality, Good economic benefit, High reusable rate, Short lead time.
Special Type: Attractive Appearance, Specially Designed for Certain Application, Longer lead time with higher costs.
For the Pier Fromwork of special type, there are 3 common shapes widely applied in the bridge constructions:
A.Hyperbolic Pier Formwork: Used in road bridge, railway bridge, flyover, ramps, etc. 
B.Portal Pier Formwork: Used in road  bridges, railway bridges, such as: Double-Pier, Triple-Pier, Multi-Pier. 
C.Corbel Pier Formwork: Used in freight railway bridges, including pier body and pier cap forms.
Packaging & Shipping

 

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
Our service

 

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
Company Profile

 

China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in SingaporeChina Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in SingaporeChina Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
 
Customer Photos

 

China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore

China Manufacturer Steel Pier Crosshead Bridge Formwork for Construction in Singapore
FAQ

Q: Are you trading company or manufacturer?

A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !

 

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier