• High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
  • High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
  • High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
  • High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
  • High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
  • High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka

High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka

After-sales Service: Online Technical Support, Onsite Installation
Warranty: One Year
Material: Steel Wood
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka pictures & photos
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
US $1,200-1,800 / Ton
Min. Order: 1 Ton
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
Hydraulic Auto-Climbing System
Type
Wall Formwork
Climbing Speed
10mm/Second
Application
High Rise Building
Transport Package
Standard Package
Trademark
Lianggong
Origin
Jiangsu, China
Production Capacity
200 Sets/Month

Packaging & Delivery

Package Size
1200.00cm * 240.00cm * 290.00cm
Package Gross Weight
20000.000kg

Product Description

Product Description

                             Hydraulic Auto-climbing Formwork
The best choice for high rise buildings and bridges
The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil cylinder and a vertical reversing box which can control the lifting rail or the lifting rack. The hydraulic system can generate inter-climbing between the formwork rack and the rail ,so that the hydraulic climbing formwork can climb up stably. During construction, the hydraulic climbing formwork doesn't need other lifting devices, and has advantages of easy operation ,quick climbing and high safety coefficient. It is the first choice for high-rise building construction.
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
 

 
Products Show
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka

High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
 
Characteristics
1.The formwork system can climb both vertically and slantwise fast.
2.The system can climb integrally or separately. The climbing process is steady, synchronous, and safe.
3.The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced.
4.The system will furnish all-round platforms and additional platform is not needed.
5.The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced.
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
 
Our Company
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
 
Customer Photos
 
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka

High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
 
FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka pictures & photos
High Rise Buildings and Bridges Hydraulic Auto-Climbing Formwork Cooperated with Doka
US $1,200-1,800 / Ton
Min. Order: 1 Ton
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25