Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Certification: | ISO |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Bracket, formwork and construction load are all borne by embeded anchors and wall through tie rods. No additional scaffolding is needed. It is suitable for construction in the high air. |
2. The maximum height of concreting can reach 6meters, and the whole part of formwork can be moved back 600mm. |
3. The formwork part can be adjusted up and down, and from left to right, relatively to the supporting bracket, and the diagonal brace type formwork can be tilted back and forth. |
4. Each connecting parts has a high degree of standardization and versatility. |
5. The formwork can be adjusted to stick tightly to concrete surface so as to avoid leaking or misaligning. |
6. The bracket system is provided with a suspended platform to facilitate removal of the anchoring parts and the appearance treatment of the concrete. |