• China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
  • China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
  • China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
  • China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
  • China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
  • China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier

China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier

After-sales Service: One-Stop Service
Warranty: One Year
Certification: ISO, CE
Material: Steel
Type: Box Girder Formwork
After-Sale Service: Online Technical Support,Online Installation
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Precast Concrete Formwork
Project Soluctioncapacity
Graphic Design,3D Model Design
Application
Bridge Pier
Color
Red,Blue or Customized
Technical Support
Romote or on-Site Instruction
Packing
Standard Package
Surface Treatment
Painted Spraying
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
Production Capacity
300 Square Meters

Product Description

Product Description

Box Girder Formwork

Box girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, thendelivered to install by good erection equipment.
 
Products Show
China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge PierChina Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge PierChina Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier

 

Packing & Delivery
 
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 
Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company
China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier

China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
Customer Photos
 
China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
China Lianggong Best Selling Precast Concrete Formwork Steel Box Girder Formwork for Bridge Pier
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25