• Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
  • Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
  • Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
  • Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
  • Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
  • Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork

Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork

Certification: ISO
Material: Steel
Type: Formwork
Transport Package: Standard Package
Specification: Customizable
Trademark: Lianggong
Samples:
US$ 20/Meter 1 Meter(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
10#, 12#
Origin
China

Product Description

Steel Waler
 

The steel waler is welded by double 10# or double 12# channel steel. The width of the channel flange is 50mm, and the distance between the double channel steel web is 53mm.

The opening on the flange of the steel waling are elliptical long holes for the project to be used for turnover. The steel waling allows a bending moment of 11.54KN/m and a shearing force of 84.81KN/m.

 
Product Show 
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork


Packing & Delivery

Packing:
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 

Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.


Our Service
1.Consulting, Design and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.


Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Our Company

Lianggong Formwork Co.,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together. 
 
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
Customer Photos

Lianggong Concrete Construction Steel Metarial Steel Waler for Formwork
FAQ
Q: Are you trading company or manufacturer?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 25-35 days, it is according to quantity.

Q: Do you provide samples ? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance, balance before shipment.
     If you have any inquiry, please contact with us directly!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now