Customization: | Available |
---|---|
After-sales Service: | on Site |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
1. Construction Simplicity • easier installation of external post-tensioned tendons |
2. Time Savings/Cost Effectiveness • precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built. • by using efficient erection method and equipment, the rapid installation of viaduct can be achieved. |
3. Quality Control Q - A/QC • precast segment to be produced in factory-manner condition w/ good quality control. • minimum interruption natural impacts such as bad weather, rain. • minimum waste of material • good precision in production |
4. Inspection and Maintenance • external prestressing tendons can be easily inspected and repaired if required. • maintenance program can be scheduled. |
Packaging:
1.Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2.Different packages are used for different products:
---Bundles:Timber beam, steel props, tie rod, etc.
---Pallet:Small parts will be put in bags and then on pallets.
---Wooden cases:It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Lianggong Formwork Co.,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.
During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.
Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
Any question, please feel free to contact us!