• Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
  • Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
  • Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
  • Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
  • Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
  • Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction

Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction

After-sales Service: Yes
Warranty: 1 Year
Certification: ISO
Material: Timber
Type: Wall Formwork
Feature: Easy Install, Economic
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Application
  • Packaging & Shipping
  • Our service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Column Formwork
Certificate
ISO9001
MOQ
100m2
Size
Customized
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
2000square Meter/Per Month

Product Description

Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction

Product Description

 

Adjustable Arced Formwork

Plywood is utilized for the panel of adjustable arced formwork, as it has a certain toughness and can be deformed without being damaged after applying an appropriate external force. By taking its such features and geometric principles, the adjustment system is used to bend the panel into the designed arcs. The adjacent adjustable arced formwork unit can be seamlessly connected by adjustable frame clamps.
This formwork system is suitable for any arced piers with radius longer than 2 meters.

Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction

Assembly process
1.Assembly of timber beam and timber beam connector
2.Assembly of plywood and frame
3.Assembly of adjusting system
4.Assembly of connecting seats
5.Overall adjustment: The formwork is bent by the adjusting system until the bending radiu of the formwork reaches the expected design value.
Application

 

Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier ConstructionLianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Packaging & Shipping

Packaging:

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Our service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process
Company Profile

 

Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Customer Photos

 

Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
Lianggong Adjustable Arced Column Construction Concrete Formwork for Water Tank/Pier Construction
FAQ

Q: Are you trading company or manufacture?

A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.

        If you have another question, please feel free to contact us !

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25