• Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
  • Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
  • Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
  • Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
  • Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
  • Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction

Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction

After-sales Service: Online Technical Support, Onsite Installation
Warranty: 1 Year
Certification: ISO9001
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction pictures & photos
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
US $1,000 / Ton
Min. Order: 100 Tons
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Formwork
Material
Q355steel
Materials
Steel
Application
Bridge Formwork
Place of Origin
Jiangsu, China
Surface Treatment
Customised
Transport Package
Standard Package
Specification
Standard & Customized
Trademark
Lianggong
Origin
Yancheng, China
HS Code
8480600000

Product Description

Product Description

Cantilever forming traveller

Cantilever forming traveller is the main equipment in cantilever construction. According to the structure, they can be divided into four types: truss type, diagonal type, channel steel type and hybrid type. As per the requirements for cantilever construction and design drawings, comprehensive comparison of various cantilever forming travellers shall be done for their characteristics, weight, steel type, construction technology, etc. The principles of designing are to make them light-weighted with simple structure, firm and stable, easy to move forward, assemble and disassemble, with strong reusability, small deformation after loading, and sufficient space for operation under the traveller, and easy for rebar working. 
 
Products Show
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction

Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
Characteristics

1.Characteristics

 (1)Reduced costs: because the equipment is rentable, it does not need to be pre-financed.

 (2) Modular: Its modular components help it adapt flexibly to different geometries.

 (3) Safety: the CFT's anchorages are hydraulically test-loaded before every pour.


2.Design Principles
 
 (1)light weight; 

 (2)simple, strong and stable structure; 

 (3)moved, mounted and stripped easily; 

  (4)strong reusability; 

  (5)small deformation under force; 

  (6)adequate space under traveler and providing a big space for bars and formwork construction operation.

Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge ConstructionBridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction

Why choose us

Experience:More than 10 years in formwork manufacturing. More than 10 years in exporting.

Cooperation:more than 100 countries ( up to 2019).

Quality:Certified by SGS, BV, EN12810, Local Test Report.

Price:Moderate, Reasonable.

Service:Friendly and Responsible, no matter before or after cooperation. 

Packing & Delivery

Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 5-30 days, it is according to quantity.
Port:  Shanghai,Qingdao,Lianyungang

Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge ConstructionBridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Our Company
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction

Customer Photos
 
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction
Bridge Formwork Cantilever Forming Formwork Shuttering for Road and Bridge Construction

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now