• High Pressed Galvanized Scaffolding Coupler
  • High Pressed Galvanized Scaffolding Coupler
  • High Pressed Galvanized Scaffolding Coupler
  • High Pressed Galvanized Scaffolding Coupler
  • High Pressed Galvanized Scaffolding Coupler
  • High Pressed Galvanized Scaffolding Coupler

High Pressed Galvanized Scaffolding Coupler

After-sales Service: One-Stop Service
Warranty: One Year
Application: Machine Parts
Certification: CE, ISO
Surface Treatment: Zine Coated
Technics: Forged
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Material
Steel
Type
Accessory
Finishing
Zine Coated or as Your Customized
Transport Package
Ton Bag
Specification
Components for O. D. 48/60mm Diameter Tubers
Trademark
LIANGGONG
Origin
China

Product Description

Product Description

Scaffolding coupler are used to joint two scaffolding tubes externally one to one. They can be flexibly built in vertical, horizontal and diagonal directions by double coupler, swivel coupler, sleeve coupler etc.. Therefore, they can be widely used in formwork scaffold and other shoring systems.

Feature

* High pressed quality
* Swivel coupler and double coupler for option
* Zine coated
* Light in quality
* Low in cost


Technical Specification
Item Name Specification Weight Finishing
Pressed Coupler TPD48 ø48/48; double 0.65kg Zine Coated
Pressed Coupler TPS48 ø48/48; swivel 0.65kg Zine Coated

Application

Connect scaffolding tubes & GI pipes

Products Show
High Pressed Galvanized Scaffolding CouplerHigh Pressed Galvanized Scaffolding Coupler

Characteristic
Easy and fast operation
All couplers can be easily and fastly installed and removed through rotate or twist screw, it not only reduce labor intensity, but also increase efficiency.
Safety and stable
*LIANGOGNG scaffolding coupler have sufficient strength and durability since we used  Q235 raw material . By improving the structure , it multiple reduces scaffold collapse accident .
*Strong corrosion-resistance thanks to the complete galvanized finishing.
*With reference to standard EN74&BS1139
Versatile usage
Scaffolding coupler consists double coupler , swivel coupler, sleeve coupler etc..., they can be widely applied to external connection between tube ,ledger tubes and long bracing .
Easy maintenance
Due to the scaffolding coupler is hard to rust and damage , it is very convenient to maintain.


Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

High Pressed Galvanized Scaffolding Coupler

Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
High Pressed Galvanized Scaffolding Coupler

Our Company
High Pressed Galvanized Scaffolding CouplerHigh Pressed Galvanized Scaffolding Coupler

Customer Photos
High Pressed Galvanized Scaffolding CouplerHigh Pressed Galvanized Scaffolding Coupler
FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.

        If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25