• Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
  • Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
  • Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
  • Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
  • Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
  • Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier

Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier

After-sales Service: One-Stop Service
Certification: ISO
Material: Steel
Type: Cantilever Forming Traveler
Application: Bridge Pier and Road
Standard: SGS
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Forming Traveller
Suface Tretment
Paint Spraying
Type of Steel for Building Structure
High-Strength Steel
MOQ
10 Tons
Certificate
ISO9001
Types
Truss Type, Diagonal Type, Channel Steel Type and
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
5000 Tons/Month

Product Description

Product Description

Cantilever Forming Traveller

Cantilever forming traveller is the main equipment in cantilever construction. According to the structure, they can be divided into four types: truss type, diagonal type, channel steel type and hybrid type. As per the requirements for cantilever construction and design drawings, comprehensive comparison of various cantilever forming travellers shall be done for their characteristics, weight, steel type, construction technology, etc. The principles of designing are to make them light-weighted with simple structure, firm and stable, easy to move forward, assemble and disassemble, with strong reusability, small deformation after loading, and sufficient space for operation under the traveller, and easy for rebar working. 

Products Show

Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge PierConcrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge PierConcrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge PierConcrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier


Characteristics
Cantilever forming traveler is widely used for the construction cast-in-site and balanced cantilever   bridges.CFT can be customized to satisfy clients's requirement. According to the structure, they can be classified as truss traveler (including rhombic, triangular, bow-string etc.), cable stayed traveler (including triangular and pre-stressed), profile steel traveler and hybrid traveler.

1.Characteristics
 (1)Reduced costs: because the equipment is rentable, it does not need to be pre-financed
 (2) Modular: Its modular components help it adapt flexibly to different geometries.
 (3) Safety: the CFT's anchorages are hydraulically test-loaded before every pour.

2.Design Principles
(1)Light weight; 
(2) Simple, strong and stable structure; 
(3) Moved, mounted and stripped easily; 
(4)Strong reusability; 
(5)Small deformation under force; 
(6)Adequate space under traveler and providing a big space for bars and formwork construction operation.




Packing & Delivery
Packing: 
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
 

Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 


Our Company

Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge PierConcrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
Customer Photos
 

Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
Concrete Panels Moldings Firm and Stable Cantilever Forming Traveller for Bridge Pier
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.

    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25