Modular System Competitive Price Steel Tunnel Formwork For Concrete Building Materials House Construction Formwork Panels
Modular House System For Tunnel Formwork
Tunnel formwork is a kind of combined type formwork, which combines the formwork of cast-in-place wall and the formwork of cast-in-place floor on the basis of the construction of large formwork, so as to support the formwork once, tie the steel bar once, and pour the wall and formwork into shape once at the same time. Because of the extra shape of this formwork is like a rectangular tunnel, it is called tunnel formwork.
Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program. This system produces effective load-bearing structures that are widely used. The tunnel formwork space spans 2.4-2.6 meters, making it easier to subdivide and build smaller spaces.
Tunnel formwork system is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure. Depending on the size of the structure, tunnel formwork system provides casting of a fl oor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production fl aws and have reduced fi ne-structure labor costs. Tunnel formwork system is preferred for military buildings as well.


* The large bays constructed using tunnel form provide exceptional flexibility in the design and layout of the building and allow a high degree of freedom in the final appearance. |
* Quality is enhanced despite the speed of construction. The precise, even steel face of the formwork creates a smooth, high quality finish capable of receiving direct decoration with the minimum of preparation (a skim coat may be required). This reduces the requirement for following trades, thus providing additional cost savings and speeding the entire process. |
* Tunnel form has integral working platforms and edge protection systems. In addition, the repetitive, predictable nature of the tasks involved encourages familiarity with operations, and, once training is complete, productivity improves as construction progresses. The minimal requirement for tools and equipment when moving the tunnel form further reduces the risk of accidents on site. |
* The insitu casting of units on site and the local availability of ready-mixed concrete supplies reduce transportation impacts. Just-in-time deliveries and near zero wastage produce an overall tidier site with associated cost savings and safety benefits. |

1.No assembling, easy operation with formed formwork.
2.High stiffness, make perfect shape for concrete.
3.Repeatedly turnover is available.
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.