Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
  • Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
  • Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
  • Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
  • Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
  • Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
Find Similar Products
  • Overview
  • Product Description
  • Characteristics
  • Detailed Photos
  • Packaging & Shipping
  • Our Service
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Common
Certification
ISO, CE
Material
Aluminum
Type
Column Formwork
Times
More Than 100 Times
Structural Style
Doors Scaffolding
Supporting Mode
Projecting Scaffolding
Erection Position
External Scaffolding
Scaffolding Part Type
Scaffolding Frames
Material Grade
Aluminum
Color
Red, Blue, Balck, Green
Nut
Heavy Duty Nut
Height
800-6250mm
Transport Package
Bundle
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
500 Tons/Month

Product Description

 
Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
 

Product Description

 

 

Skydeck Formwork
Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork

Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork

 

Lianggong Skydeck Slab Formwork is one of the most efficient and labour-saving panel slab formworks. With highly light aluminium frame panels, safe handy and high loading capacity aluminium props, easy to learn assembly sequence and slab forming can be implemented rapidly in residential and industrial construction projects with thicker slabs. 

Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork
- Props with Built-in taps and safe stopping device makes safe and fast operation.
- For slab thickness up to 100cm with 150cm main beam, and up to 40cm with 225cm main beam.
- Flexible solution with specially designed accessories for infill area around columns or edge of slab near walls.
- 750/500/375mm width by 1500/750mm length aluminium panels lined with Form birch,the biggest size panel 750*1500mm only weights 16.2kg.
   
Model LG120 LG250 LG350 LG480 LG625
Min.Length (mm) 800 1450 1980 2600 4300
Max.Length (mm) 1200 2500 3500 4800 6250
Weight (Kg) 10.4 15.5 18.7 23.8 30.2
Min~ Max Load (kN) 70~90 60~70 42~88 25~85 20-56

Aluminium Props range from 800mm to 625mm and have a maximum workload of up to 90kN.
 

Characteristics

- Lightweight aluminium panels and props make it a handset slab formwork.
- Powder-coated frame, beams and props outer tube thus effortless and fast cleaning.
- Table transforming is available by connecting props, beams and panels together with truss bracing.
- Early stripping heads reduce on-site material requirements and result in quick deployment of panels.
- High load capacity Aluminum prop means lower density slab props required,around 0.3 pieces Per  only.

 

Detailed Photos


Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork

Packaging & Shipping

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.


Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork

Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Company Profile

Lianggong Aluminium Frame Panelized Early Stripping Fair Faced Concrete Peri Type Skydeck Slab Formwork

FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.


Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.


Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.

    
Any question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier