Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
  • Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
  • Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
  • Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
  • Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
  • Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Find Similar Products

Basic Info.

Model NO.
climbling formwork
Material
Steel
Type
Wall Formwork
Height of Climbing Per Times
3-5m
Height of Bracket
10-15m
Quantity of Platform
4-7
Advantage
Longlife
Transport Package
Standard Package
Specification
6-12m
Trademark
LIANGGONG
Origin
China
Production Capacity
400sets/Month

Packaging & Delivery

Package Size
30.00cm * 20.00cm * 10.00cm
Package Gross Weight
500.000kg

Product Description

Product Description

 

Single-side Climbing Bracket (CB180&CB240)

CB180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.Typical applications for the CB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.
They are framework brackets for supporting large-area wall formwork. 
Typical applications for the CB240 are pier and column/shear wall/core walll/ in the building.
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
 
Products Show
 



Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in RussiaLianggong Dam Formwork /Climbing Formwork for Retaining Wall in RussiaLianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Characteristics
 
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
 
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
 
Customer Photos
 
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia

Lianggong Dam Formwork /Climbing Formwork for Retaining Wall in Russia
 
FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier