|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Online Technical Support, Onsite Installation, Ons |
| Warranty: | 1 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel formwork System

| Part name | Steel Formwork |
| Material | Q235B,Q355 Steel |
| Design time | The time of design the preliminary technical scheme is 3days. |
| The time of design the fabrication drawings is 5 days. | |
| Fabrication | The normally time is about 30 days. |
| Delivery | LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port. |
| Installation on project site | LIANGGONG can arrange 1-2 enginner to provide technical support to the project site. |
| 1 | Easy To Handle: Easy operation, workers under correct direction will be competent for the work. |
| 2 | Widely Used:Free size, suitable for any height by connecting different size vertical props together. |
| 3 | Improving Construction: Make the construction site neat and clear, improve the project Quality. |
| 4 | Recyclable: formwork is spray pained to against rustiness which can be reusable for many times. |
| 5 | Strong Build:to support heavy weight and high quality finish. |