Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
  • Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
  • Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
  • Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
  • Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
  • Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
Find Similar Products
  • Overview
  • Product Feature
  • Product Application
  • Packaging & Shipping
  • Company Profile
  • Honors & Certifications
  • Customer Visit
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
Tunnel Formwork for Housing
Certification
ISO
Material
Steel
Type
Tunnel Formwork
Panel Material
Q235 Steel
Surface Treatment
Powder Coated
Application
High Rise Buildings
Panel Thickness
3.5mm
Key Advantages
Stable, Flexible, Easy Assemble
Color
Customized
Transport Package
Container
Specification
Standard
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
200 Tons/Month

Packaging & Delivery

Package Size
25.00cm * 25.00cm * 25.00cm
Package Gross Weight
1000.000kg

Product Description

Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

Tunnel Formwork For Housing

Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program. This system produces effective load-bearing structures that are widely used. It is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure. Depending on the size of the structure, tunnel formwork system provides casting of a floor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production flaws and have reduced fine-structure labor costs. 
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
 

Product Feature

Overall Feature
1.The roof wall is formed at one time.
2. Modular design, quick to use.
3. Factory pre-assembled, easy disassembly and assembly.
4. All-steel structure. Strong and durable.
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

Product Application

 
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
1. The formwork of the shaft part is directly hoisted out from above.
2. Lift the other half of the formwork.
3. The wellbore is closed with a formwork, and the wellbore template is arranged on the formwork.
When the formwork is inverted, the blocking system is hoisted together with the formwork.
The formwork of the guide wall system will be poured directly into the building, and the site can be considered to be made of steel.

 

Packaging & Shipping

Packing 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery 1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
 

Company Profile


Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

Honors & Certifications

Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

Customer Visit

Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

Our Advantages

Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
 
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork

FAQ


Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship. 
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.

    Factory Modualr Tunnel Formwork for Housing Construction Concrete Formwork
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier