Table formwork is a kind of formwork that is used for floor pouring, used widely in high-rise buildings, multi-level factory buildings, underground structures, etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting the fork to an upper level and reused, without the need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and reusable. It has eliminated the traditional way of slab support system, which consists of clocks, eel pipes, and timber planks. The construction speeds up obviously, and manpower has been saved greatly. Products Show

Characteristics
The standard unit of table formwork
Table formwork standard unit has two sizes: 2.44 × 4.88m and 3.3 × 5m. The structure diagram is as follows:
For untypical floor casting, the non-standard table formwork can be designed according to the need. The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.
Edge and middle filler

Table formwork guardrail
The guardrail can be set at the edge of the floor as needed, as shown in the figure:
Lifting fork
The lifting fork for table formwork is used for lifting the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting forks s as shown:
Shifting Trolley
The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.
Trolley application diagram
Packing & Delivery
Packaging:
1. Generally, the total net weight of the loaded container is 22 tons to 25tons, which needs to be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available at the customer's request.
---Bulk: Some irregular goods will be loaded in bulk in the container.
Delivery:
1. Production: For a full container, normally we need 20-30 days after receiving the customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2. Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high-quality standard products.
The test report will be available according to different norms from different regions to offer no worries to clients or meet destination authority requirements.
3. Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4. Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. We aim to make customers feel at ease and satisfied throughout the process.
Our Company
FAQ
Q: Are you a trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need to pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
If you have any other questions, please feel free to contact us!