Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building

Product Details
Customization: Available
After-sales Service: Online Technical Support, Onsite Installation
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
  • Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
  • Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
  • Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
  • Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
  • Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Find Similar Products

Basic Info.

Model NO.
formwork
Certification
ISO, ISO9001
Material
Q355steel
Type
Slab Formwork
Materials
Steel
Application
Hotel, Wall, Column, Core Tube, etc
Place of Origin
Jiangsu, China
Surface Treatment
Customised
Transport Package
Standard Package
Specification
Standard & Customized
Trademark
Lianggong
Origin
Yancheng, China
HS Code
730840

Packaging & Delivery

Package Size
60.00cm * 120.00cm * 8.00cm
Package Gross Weight
19.000kg

Product Description

Lianggong Formwork Steel Frame Formwork Early Stripping slab formwork for high building 
Product Description

T-Form System

Item  Model  Dimention  Area Unit weight
(kg)

T-Form Panel
TF1812 1800X1200mm 2.16 44.000 
TF1809 1800x900mm 1.62 38.000 
TF1806 1800x600mm 1.08 30.000 
TF1512 1500X1200mm 1.8 40.600 
TF1509 1500x900mm 1.35 33.000 
TF1506 1500x600mm 0.9 25.000 
TF1212 1200x1200mm 1.44 32.000 
TF1209 1200x900mm 1.08 26.000 
TF1206 1200x600mm 0.72 22.000 
TF0909 900x900mm 0.81 22.000 
TF0906 900x600mm 0.54 18.000 
TF0606 600x600mm 0.36 13.500 
 

T-form for Slab concrete 

T-form is for horizontal floor concrete.With many sizes,the biggest size is 1800X1200 mm, each panel with the early stripping mechanism,it can shorten the construction period and save your time. 
The erection speed is as high as 60-100 square meters per person per day.
Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.3-4 workers in a team can quickly and easily set up and remove the panels.
 
Products Show
 
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building

Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building


Characteristics
1.More Quickly:
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.

2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly

3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories

4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.

5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.

6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.

7.Standardized panel for various structure building
- All formwork component can be reusable on different project.

Packing & Delivery
Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 25-30 days, it is according to quantity.
Port:  Shanghai,Qingdao
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building



Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Our Company
 
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High BuildingLianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High BuildingLianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High BuildingLianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High BuildingLianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Customer Photos
 
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
 
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building
Lianggong Formwork Steel Frame Formwork Early Stripping Slab Formwork for High Building


 
FAQ

Q1:Are you trading company or manufacturer?
A:We are manufacturer for 12 years.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3-5 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~40 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier