Hydraulic Tunnel Lining Trolley for Railway and Highway Tunnels Construction
| Customization: | Available |
|---|---|
| After-sales Service: | Online Coach |
| Warranty: | 1 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
360° Virtual Tour
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Find Similar Products
Basic Info.
- Model NO.
- Customized
- Certification
- ISO, 9001: 2000
- Material
- Steel
- Type
- Trolley
- Condition
- New
- Waling Speed
- 8m/Min
- Traveling Motor
- 15kw
- Size
- Customized
- Transport Package
- Standard Package
- Specification
- 6-12m
- Trademark
- LIANGGONG
- Origin
- China
- HS Code
- 847910
- Production Capacity
- 3000 Tons/Year
Packaging & Delivery
- Package Size
- 250.00cm * 220.00cm * 230.00cm
- Package Gross Weight
- 2000.000kg
Product Description
Hydraulic Tunnel Lining Trolley
Structure diagram of hydraulic tunnel lining trolley
| Specification: 6-12m |
| Maximum lining length: L=12m |
| Crawling ability: 4% |
| Total power: 22.5KW |
Packing Details : Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 5-30 days, it is according to quantity.
Port: Shanghai
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q: Are you a trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance ,balance before shippment.
Send your message to this supplier
People who viewed this also viewed
Find Similar Products By Category
- Supplier Homepage
- Products
- Tunnel Formwork Systems
- Hydraulic Tunnel Lining Trolley
- Hydraulic Tunnel Lining Trolley for Railway and Highway Tunnels Construction