Hydraulic Auto-climbing Formwork
The hydraulic auto-climbing formwork system (ACS) is a wall-attached self-climbing formwork system, which is powered by its own hydraulic lifting system. The formwork system (ACS) includes a hydraulic cylinder, an upper and lower commutator, which can switch the lifting power on the main bracket or climbing rail.


1.Hydraulic auto-climbing formwork can climb as a complete set or individually. The climbing process is steady, synchronous and safe. |
2.The brackets of the auto-climbing formwork system will not be dismantled until the construction period finished, thus saving space for the site and avoiding damage to the formwork, especially to the panel. |
3.It provides all-round operating platforms. The contractors do not need to set up other operating platforms, thus saving the cost on material and labor, and improving safety |
4.The error of structure construction is small. As work on correction is simple, the construction error can be eliminated floor by floor. |
5.The climbing speed of the formwork system is fast. It can speed up the whole construction work (average 5 days for one floor). |
6.The formwork can climb by itself and cleaning work can be done in situ, so that the use of tower crane will be greatly reduced. |
Two types of hydraulic auto-climbing formworks: HCB-100&HCB-120
1.Structure diagram of diagonal brace type
2.Structure diagram of truss type
Composite truss
Separate truss
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.


Q: Are you a trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
If you have another question, please feel free to contact us !