• Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
  • Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
  • Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
  • Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
  • Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
  • Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction

Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction

After-sales Service: Yes
Warranty: 1year
Type: Bearing
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction pictures & photos
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
US $480-1,200 / Set
Min. Order: 1 Set
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Climbing Formwork
Application
Shear Wall, Pier, High Rise Building
Certification
ISO9001: 2000
Condition
New
Height of Climbing Per Times
3-6m
Quantity of Platform
4-7
Transport Package
Standard Package
Specification
6-12m
Trademark
LIANGGONG
Origin
China
Production Capacity
400sets/Month

Packaging & Delivery

Package Size
30.00cm * 20.00cm * 10.00cm
Package Gross Weight
300.000kg

Product Description

Product Description

Climbing Formwork(CB180 & CB240)
 
Climbing formwork, CB-180 and CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.
Climbing
 formwork CB-240 has lifting units in two types: diagonal brace type and truss type. Truss type is more suitable for the cases with heavier construction load, higher formwork erection and smaller scope of inclination.
The main difference between CB-180 and CB-240 is the main bracket. The width of main platform of these two systems is 180 cm and 240 cm respectively.  

Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Products Show
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction

Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Characteristics
 
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
 
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
 
Our Company
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Customer Photos
 
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction

Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
FAQ

Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction pictures & photos
Customized Crane-Lifted Cantilever Climbing Bracket Formwork for Shear Wall Construction
US $480-1,200 / Set
Min. Order: 1 Set
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25