Tunnel Formwork
Tunnel form is a formwork system that allows casting of walls and slabs in one operation resulting in a cellular RCC structure. It combines speed, quality, and accuracy with the flexibility and economy of in-situ construction. The system creates an efficient load-bearing structure for use in a wide variety of applications. It is particularly effective in projects suited to repetitive cellular construction such as residential blocks, hotels, student accommodation, barracks, and prisons.
The cycle time of the tunnel formwork system lies between 1 to 3 days, which is very little compared to other formwork systems. So tunnel formwork took a lead in the time-saving of projects which indirectly affect the total project cost.
1 |
High seismic resistance due to monolithic slab & walls construction |
2 |
Monolithic structure reduces number of joints and improves water tightness |
3 |
Reduce labor costs (greater requirement of tower crane) |
4 |
Reduce mobilization costs on site |
5 |
Reduced construction times (2-3 days slab casting cycle can be achieved) which is up to 3 times faster than conventional |
6 |
Higher quality finishes -Fair faced finish concrete can be achieved |
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2. What do you do?
A: We design and manufacture formworkand scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings,towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to thebuilders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer thestructural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Please feel free to contact us if you have any questions!