Shuttering Formwork Support Material Steel Waler for Building Concrete

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Shuttering Formwork Support Material Steel Waler for Building Concrete
  • Shuttering Formwork Support Material Steel Waler for Building Concrete
  • Shuttering Formwork Support Material Steel Waler for Building Concrete
  • Shuttering Formwork Support Material Steel Waler for Building Concrete
  • Shuttering Formwork Support Material Steel Waler for Building Concrete
  • Shuttering Formwork Support Material Steel Waler for Building Concrete
Find Similar Products

Basic Info.

Model NO.
Steel Waler
Certification
ISO
Material
Steel
Application
Support Formwork System
Unit Weight
20-24 Kg/M
Finishing
Painted
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China

Product Description

Product Description

Steel Waler
 
The steel waler is welded by double 10# or double 12# channel steel. The width of the channel flange is 50mm, and the distance between the double channel steel web is 53mm.

The opening on the flange of the steel waling are elliptical long holes for the project to be used for turnover. The steel waling allows a bending moment of 11.54KN/m and a shearing force of 84.81KN/m.

 
Product Show 
Shuttering Formwork Support Material Steel Waler for Building Concrete
Shuttering Formwork Support Material Steel Waler for Building Concrete
 
Shuttering Formwork Support Material Steel Waler for Building Concrete
Shuttering Formwork Support Material Steel Waler for Building Concrete
Shuttering Formwork Support Material Steel Waler for Building Concrete
Shuttering Formwork Support Material Steel Waler for Building Concrete


Packing & Delivery

Packing:
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 

Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Shuttering Formwork Support Material Steel Waler for Building Concrete
Our Company

Shuttering Formwork Support Material Steel Waler for Building Concrete

Shuttering Formwork Support Material Steel Waler for Building Concrete
Shuttering Formwork Support Material Steel Waler for Building Concrete
Customer Photos

Shuttering Formwork Support Material Steel Waler for Building Concrete
FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier