• China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
  • China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
  • China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
  • China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
  • China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
  • China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction

China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction

After-sales Service: Online Technical Support
Warranty: 1 Year
Certification: ISO
Material: Steel
Type: Tunnel Formwork
Brand Name: Lianggong
Samples:
US$ 176856/Set 1 Set(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Product Show
  • Packaging & Shipping
  • Our Service
  • Our Company
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Hydraulic Tunnel Lining Trolley
Application
Tunnel
Color
Blue or Customized
Weight
80-120ton/Set
Product Name
Hydraulic Tunnel Lining Trolley
Usage
Easy to Use
Specifications
6-12m
Walking Speed
8m/Min
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Crawling Ability
4%
Keywords
China Hydraulic Trolley for Tunnel Construction
Title
China Steel Formwork for Construction
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
Production Capacity
60000 Ton/Tons Per Year

Product Description

Product Description

Hydraulic Tunnel Lining Trolley

Designed and developed by our own company, hydraulic tunnel lining trolley is an ideal system for formwork lining of railway and highway tunnels. Driven by electrical motors, it is able to move and walk by itself, with hydraulic cylinder and screw jack being used to position and retrieve the formwork. The trolley has many advantages in operation, such as low cost, reliable structure, convenient operation, fast lining speed and good tunnel surface.

China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
Structure diagram of hydraulic tunnel lining trolleyChina Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
Elevation layout drawing of Hydraulic Tunnel Lining Trolley
 
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
Side layout drawing of Hydraulic Tunnel Lining Trolley
 

Technical parameters

Specifications: 6-12 m
Maximum lining length: L=12m (can be adjusted according to the customers)per unit
Maximum passing capacity: (height * width) construction does not affect the car at the same time
Crawling ability: 4%
Walking speed: 8m/min
Total power: 22.5KW   Traveling motor 7.5KW*2=15KW  oil pump motor 7.5KW
Pressure of hydraulic system:Pmax=16Mpa
Unilateral modulus removal of formwork:Amin=150
Left and right adjustment of horizontal cylinder:Bmax=100mm
Lifting cylinder: 300mm
Maximum stroke of the cylinder: lateral cylinder 300mm
Horizontal cylinder: 250mm
 

Product Show

 
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction

Packaging & Shipping

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 

China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service


1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company

China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction

Customer Photos

 
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
China Lianggong Building Material Steel Formwork System Hydraulic Tunnel Lining Trolley for Construction
 

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now