Adjustable Arced Formwork for Concrete Pouring

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Adjustable Arced Formwork for Concrete Pouring
  • Adjustable Arced Formwork for Concrete Pouring
  • Adjustable Arced Formwork for Concrete Pouring
  • Adjustable Arced Formwork for Concrete Pouring
  • Adjustable Arced Formwork for Concrete Pouring
Find Similar Products

Basic Info.

Model NO.
Column formwork
Certification
ISO
Material
Timber Beam+Plywood+Steel
Type
Wall Formwork
Color
Blue,Red,Customized
Usage
Outdoor
Application
Civil Engineering and Building Construction
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
10000 Pieces/Month

Product Description

Product Description

Adjustable Arced Formwork

Plywood is utilized for the panel of adjustbale arced formwork, as it has a certain toughness and can be deformed without being damaged after applying an appropriate external force. By taking its such features and geometric principles, the adjustment system is used to bend the panel into the designed arcs. The adjacent arced formwork unit canbe seamlessly connected by adjustable frame clamps.
This formwork system is suitable for any arced piers with radius longer than 2 meters.


Products Show
Adjustable Arced Formwork for Concrete Pouring
Adjustable arced formwork lifting

Adjustable Arced Formwork for Concrete Pouring

 
Packing & Delivery
 
Packing Details:Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details:Generally it is 5-30 days, it is according to quantity.
Port:Shanghai
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Our Company
Adjustable Arced Formwork for Concrete Pouring
Customer Photos
 
Adjustable Arced Formwork for Concrete Pouring
Adjustable Arced Formwork for Concrete Pouring

 
FAQ
Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier