Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, Onsite Installation |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Concrete Box Culvert Mould for Pipe Corridor Construction
LIANGGONG's cast-in-place concrete box culvert mould system is one of the most cost-effective methods for accelerating your construction process. With the LIANGGONG Box Culvert Traveler system, you have several options to fulfill your project requirements. The Box Culvert Traveler System requires very minimal labor to configure and cycle from setup to setup. Count on the Traveler Form to produce large and smooth surfaces every time. This system easily handles multiple barrel boxes and can be customized to meet the needs for specific requirements.
1
|
Shape and Dimensional Accuracy: Formwork ensures that box culverts are molded with precision, adhering to specific dimensions and shapes outlined in engineering and design plans.
|
|||
2
|
Structural Stability: The formwork provides a temporary mold that supports the concrete as it cures, contributing to the overall structural stability and integrity of the box culvert.
|
|||
3
|
Efficient Construction: By using formwork, construction processes become more efficient. Precast elements can be manufactured off-site, reducing on-site construction time and potential disruptions.
|
|||
4
|
Quality Control: Formwork allows for strict quality control measures during the construction process, ensuring that the box culvert meets required standards for strength, durability, and safety.
|
|||
5
|
Cost-Effectiveness: Despite the initial investment in formwork, the overall cost can be lower due to increased efficiency, reduced labor requirements, and minimized material wastage during construction.
|
|||
6
|
Design Flexibility: Formwork can be customized to accommodate various sizes and shapes, providing flexibility in design to meet specific project requirements.
|
|||
7
|
Repeatability and Reusability: Formwork systems can be reused for multiple units of box culverts, particularly in projects with similar specifications, improving cost-effectiveness and minimizing material consumption.
|
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.