Timber Beam Formwork
Timber beam formwork system consists of plywood, H20 timber beam, steel waler and lifting hook. The plywood and the timber beam are connected by the self-tapping screw. Steel waler and timber beam are connected with flange clamp. Two hooks are arranged symmetrically on both sides of the timber beam. The timber beam is assembled on site by standardized accessories, which is convenient for disassembly and assembly.
It is light in weight and convenient for construction and transportation. The formwork panel is plywood, and the board surface is smooth, being good for water absorption and air transmission. Without being tainted, the concrete surface has good appearance, in high quality and turnover rates. Thus, it has been widely used in walls, columns, piers and dams.
Column formwork
The timber beam column formwork is mainly used for casting columns, and its structure and connecting way are quite similar to that of wall formwork.
Adjustable column formwork
The adjustable column formwork enables concrete casting of square or rectangular columns within a specific range by adjusting the size of the formwork section area. The adjustment is realized by changing the relative position of the walers.
There are three specifications for the walers of adjustable column formwork, which can do concrete casting of square or rectangular columns with side length of 200-1400mm. Sizes of column to be casted as follows:
Length of waler (m) |
Scope of side length of column to be casted (m) |
1.6 and 1.9 |
1.0 ~ 1.4 |
1.6 and 1.3 |
0.6 ~ 1.0 |
1.3 and 0.9 |
0.2 ~ 0.6 |
It can be adjusted to any cross-section size within the allowable range, both square and rectangular. The schematic diagram of adjustment is as follows:
Wall diagonal brace
The timber beam wall column formwork needs to be equipped with a spindle strut, which is used as an adjusting system as shown in the figure:
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
Please feel free to contact Lydia Zou, if you have any questions!