High-Authority Cantilever Climbing Formwork for Construction

Product Details
Customization: Available
Certification: ISO
Material: Plywood + Timber Beam + Steel Material
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • High-Authority Cantilever Climbing Formwork for Construction
  • High-Authority Cantilever Climbing Formwork for Construction
  • High-Authority Cantilever Climbing Formwork for Construction
  • High-Authority Cantilever Climbing Formwork for Construction
  • High-Authority Cantilever Climbing Formwork for Construction
  • High-Authority Cantilever Climbing Formwork for Construction
Find Similar Products

Basic Info.

Model NO.
Climbing Formwork
Application
High Rise Building
Height of Climbing Per Times
3-5m
Height of Bracket
10-15m
Quantity of Platform
4-7
Transport Package
Standard Package
Specification
6-12m
Trademark
LIANGGONG
Origin
China
Production Capacity
400 Sets/Month

Product Description

Product Description

Cantilever Climbing Formwork

The cantilever climbing formwork are used  for large-area concrete pouring,such as for dams,piers,anchors,retaining walls,tunnels and basements.The lateral pressure of concrete is borne by anchors and wall-through tie rods,so that no other reinforcement is needed for the formwork.It is featured by its simple and quick operation,wide range adjustment for one-off casting height,smooth concrete surface,and economy and durability.
Products ShowHigh-Authority Cantilever Climbing Formwork for Construction

High-Authority Cantilever Climbing Formwork for Construction
High-Authority Cantilever Climbing Formwork for Construction

Characteristics
1.Bracket,formwork and construction load are all borne by embedded anchors and wall-through tie rods.No additional scaffolding is needed.It is suitable for construction in the high air.

2.The maximum height of concreting can reach 6 meters,and the whole part of formwork can ba moved back 600 mm.

3.The formwork part can be adjusted up and down,and form left to right,relatively to the supporting bracket,and the diagonal brace type formwork can be tilted back and forth.

4.Each connecting parts has a high degree of standardization and versatility.

5.The formwork can be sdjusted to stick tightly to concrete surface so as to avoid leaking or misaligning.

6.The bracket system is provided with a suspended platform to facilitate removal of the anchoring parts and the appearance treatment of the concrete.

 
Packing & Delivery
 
Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 5-30 days, it is according to quantity.
Port:  Shanghai
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
High-Authority Cantilever Climbing Formwork for Construction
High-Authority Cantilever Climbing Formwork for Construction
Customer Photos
 
High-Authority Cantilever Climbing Formwork for Construction
High-Authority Cantilever Climbing Formwork for Construction

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier