Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 68/Square Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Frame Formwork
Steel Frame Formwork Steel frame formwork is made up of 12mm
thick plywood covered with hollow steel. It is a complete product
system with many types, such as column formwork, wall formwork,
slab formwork and so on. Ancillary products and accessory variety are
complete, and product assembly is convenient. It is practical, safe,
reliable, cost-saving and applicable to various solutions. As a result, it
provides a set of complete and reliable formwork products for building
construction, especially wall and column construction.
No.
|
Dimention (mm)
|
Area (m2)
|
Unit Weight (Kg)
|
1
|
3000*1200
|
3.6
|
130.55
|
2
|
3000*1000
|
3
|
114.51
|
3
|
3000*750
|
2.25
|
88.16
|
4
|
3000*500
|
1.5
|
61.84
|
5
|
2400*1200
|
2.88
|
105.77
|
6
|
2400*1000
|
2.4
|
92.00
|
7
|
2400*750
|
1.8
|
71.12
|
8
|
2400*500
|
1.2
|
49.91
|
9
|
1200*1200
|
1.44
|
55.09
|
10
|
1200*1000
|
1.2
|
47.88
|
11
|
1200*750
|
0.9
|
37.19
|
12
|
1200*500
|
0.6
|
26.07
|
13
|
600*1200
|
0.72
|
29.74
|
14
|
600*1000
|
0.6
|
25.82
|
15
|
600*750
|
0.45
|
20.03
|
16
|
600*500
|
0.3
|
14.11
|
Drop Head Slab Formwork
Item | Model | Dimention (mm) |
Area (m2) |
Unit Weight (kg) |
Drophead
Slab
Formwork
Panel
|
TF1812 | 1800x1200 | 2.16 | 44 |
TF1809 | 1800x900 | 1.62 | 38 | |
TF1806 | 1800x600 | 1.08 | 30 | |
TF1512 | 1500X1200 | 1.8 | 40.6 | |
TF1509 | 1500x900 | 1.35 | 33 | |
TF1506 | 1500x600 | 0.9 | 25 | |
TF1212 | 1200x1200 | 1.44 | 32 | |
TF1209 | 1200x900 | 1.08 | 26 | |
TF1206 | 1200x600 | 0.72 | 22 | |
TF0909 | 900x900 | 0.81 | 22 | |
TF0906 | 900x600 | 0.54 | 18.000 | |
TF0606 | 600x600 | 0.36 | 13.5 |
1. Time and Labor Savings
Quick assembly and disassembly.Reduce construction time and labor.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.1 | Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2 | Transportation: It depends on the destination charge port. |
3 | Negotiation is needed for special requirements. |
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.Q: Are you trading company or manufacturer ?