China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Still deciding? Get samples of US$ 300/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
  • China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
  • China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
  • China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
  • China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
  • China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
Find Similar Products
  • Overview
  • Product Description
  • Product Show
  • Packaging & Shipping
  • Our Service
  • Our Company
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Steel Frame Slab Formwork
Certification
ISO, CE
Material
Steel
Type
Slab Formwork
Title
China Steel Frame Formwork for Slab Constructi
Product Name
Steel Frame Formwork
Keyword
Concrete Slab Formwork
Surface Finish
Paint, Powder Coated, Galvanization
Color
Red, White, or Customized
After-Sale Service
Online Technical Support, Onsite Installation, Ons
Application
Building Construction
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Advantage
Quick Assemble
MOQ
300 PCS
Usagetime
More Than 200 Times
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
Jiangsu, China
HS Code
848060
Production Capacity
2000 Meter/Meters Per Month

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 10.00cm
Package Gross Weight
10.000kg
Lead Time
30 days (1 - 300 Pieces)
To be negotiated ( > 300 Pieces)

Product Description

China Lianggong Manufacture Quick Release Concrete Steel Frame Slab Table Formwork for Construction
Product Description

Steel frame formwork

Steel frame formwork is made up of 18mm OR 15mm thick plywood covered with hollow steel. It is a complete product system with many types, such as wall formwork, column formwork, slab formwork and so on. Ancillary products and accessory variety are complete, and product assembly is convenient. It is practical, safe, reliable, cost-saving and applicable to various solutions. As a result, it provides a set of complete and reliable formwork products for building construction, especially wall and column construction.Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting fork to an upper level and reused, without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks, eel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly.

China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork

 

Product Show
China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
 
Packaging & Shipping

Packing

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 

China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
Delivery
1 Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2 Transportation: It depends on the destination charge port. 
3 Negotiation is needed for special requirements.
 
Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company

China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork

 
China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork
 
Customer Photos

China Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame FormworkChina Lianggong Formwork Manufacture Early Stripping Building Material Concrete Slab Table Form Steel Frame Formwork

 
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

Any question, please feel free to contact us !
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier