Hydraulic Auto Climbing Formwork System
Product Description
The hydraulic auto-climbing formwork system (ACS) is a wall-attached self-climbing formwork system, which is powered by its own hydraulic lifting system. The formwork system (ACS) includes a hydraulic cylinder, an upper and lower commutator, which can switch the lifting power on the main bracket or climbing rail. With the power by the hydraulic system, the main bracket and climbing rail are able to climb respectively. Therefore, the complete hydraulic auto-climbing system (ACS) climbs steadily without crane. No other lifting device is needed when using the hydraulic auto-climbing formwork, which has the advantages of being easy to operate, fast and safe in the climbing process. ACS is the first-choice formwork system for high-rise tower and bridge construction.
Characteristics
1.Hydraulic auto-climbing formwork can climb completely or individually. The climbing process is steady, synchronous and safe.
2.The brackets of the auto-climbing formwork system will not be dismantled until the construction period finished, thus saving space for the site and avoiding damage to the formwork, especially to the panel.
3.It provides all-round operating platforms. The contractors do not need to set up other operating platforms, thus saving the cost on material and labor, and improving safety.
4.The error of structure construction is small. As work on correction is simple, the construction error can be eliminated floor by floor.
5.The climbing speed of the formwork system is fast. It can speed up the whole construction work (average 5 days for one floor).
6.The formwork can climb by itself and cleaning work can be done in situ, so that the use of tower crane will be greatly reduced.
Applications
1. Shenyang Baoneng Global Financial Cenrer T1. T2
2. Haemonious Century Aquare
3. Zhongyu International Building
4. Bengbu Sports Center Landscape Tower
5. Yueqing Bay No.2 Bridge
6. Poyang Lake Bridge
7. Wuhu Second Bridge on Yangtze River
8. Polonggou Bridge
9. Section1, 2, 3 of the main channel of Zhoushan Port
10. Yanpingba Yangtze River Bridge
11. Oubei Bridge
12. Wangdong Yangtze River Highway Bridge
Our Company
- Doka & Peri background engineers
- Customized solution helps you work safe, save cost and convenient
- Excellent quality for formwork & scaffolding with wide choices
- Fast, flexible in order delivering
- After service including on-site supervision
FAQ
Q: Are you trading company or manufacturer?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. Or according to the quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance, balance before shippment.
If you have any inquiry, pls contact with us directly!