• Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
  • Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
  • Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
  • Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
  • Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
  • Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180

Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180

After-sales Service: Yes
Warranty: 1year
Certification: CE
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180 pictures & photos
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
US $480-1,200 / Set
Min. Order: 1 Set
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packaging & Shipping
  • Our service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Climbing Formwork
Material
Steel
Type
Climbing Formwork
Height of Climbing Per Times
3-5m
Height of Bracket
10-15m
Quantity of Platform
4-7
Surface
Painted
Transport Package
Standard Package
Specification
6-12m
Trademark
LIANGGONG
Origin
China
Production Capacity
400sets/Month

Packaging & Delivery

Package Size
30.00cm * 20.00cm * 10.00cm
Package Gross Weight
500.000kg

Product Description

Product Description

 

Climbing Formwork (CB180 &CB240)

 Climbing formwork CB-240 is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect.

The climbing forwork CB-240 has two types of climing units, which are pull-push prop climbing unit and truss climbing unit. The latter is better for the construction form of heavier load, higher height but less inclined angle.

Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
 
Detailed Photos

 

Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Characteristics

 


 
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
 
Packaging & Shipping

 

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
 
Our service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Company Profile

 

Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Customer Photos

 

Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180

Jumped Climbing Bracket Formwork for Core Wall Similar Doka/Peri CB240/CB180
FAQ

 

Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now